OK, so I ordered my new bike on May 12, knowing it would be a four week delay. After four weeks were up, I was told it'd be another four weeks. After those four weeks were up, I was told it would be another 8 to 10 weeks. So basically, the bike I ordered on May 12 was now scheduled for a late August delivery date. Needless to say, I was pissed. So I called the bike shop and bitched, and I called the manufacturer and bitched. All that bitching got me a frame and shock upgrade at no additional charge ($400 upgrade), and the bike will be delivered next week.
So the Titus Switchblade I ordered is a thing of the past. I am now getting a Titus Quasi-Moto. The Quasi-Moto is a pound heavier, but I was able to lose the pound by swapping out the coil shock for an air shock. WOO HOO!
The Quasi-Moto (mine will be chrome-colored):
So the Titus Switchblade I ordered is a thing of the past. I am now getting a Titus Quasi-Moto. The Quasi-Moto is a pound heavier, but I was able to lose the pound by swapping out the coil shock for an air shock. WOO HOO!
The Quasi-Moto (mine will be chrome-colored):