Coop817
Registered
If I'm going to use prop as a front load for a test cyp cycle, how long should I run the prop?
Also if I'm going to use Npp as a front load for Deca, his long should I run the Npp.
I was thinking 2 weeks for the prop and 5 weeks for the Npp...,is this accurate?
Also if I'm going to use Npp as a front load for Deca, his long should I run the Npp.
I was thinking 2 weeks for the prop and 5 weeks for the Npp...,is this accurate?